The Birth of a Suspended Platform

At Shenxi’s production base, every suspended access platform is not a simple copy of standardized assembly‑line products. Instead, it is refined step‑by‑step starting from on‑site project survey, before being delivered to construction sites to protect the safety of high‑altitude operators. The complete birth of one piece of equipment begins with field investigation prior to drawing design.

At the start of a project, Shenxi’s technical team travels to the construction site to conduct on‑site surveys of building roof structures, parapet styles and facade shapes. It calculates local wind pressure, working height and mounting conditions. Combined with construction procedures, roof loads are rechecked and risks of interference from curtain wall components are identified to produce a customized layout plan. Ready‑made model parameters are not simply adopted. Platform dimensions, counterweight configurations and wind‑resistant structures are determined according to actual site conditions to avoid hidden troubles such as impossible installation and temporary modification after equipment arrival. Only after multiple rounds of verification and confirmation does the project formally move to structural design.

In the design phase, engineers complete modeling and calculation covering working loads, alternating vibration and high‑altitude fatigue conditions to define profile specifications and the layout of stress‑bearing nodes. Welding procedures are planned in advance for key load‑bearing positions, with clear technical requirements for multi‑layer overlay welding to prevent weld cracking during long‑term service. After drawings are finalized, steel materials go through incoming inspection. Thickness, material grade and mechanical properties of raw materials are tested item by item. Non‑conforming materials are rejected directly and will not enter processing procedures.

After steel cutting and bending, the welding process commences. For critical positions such as main frames and stress‑bearing fulcrums, fast spot welding is avoided. Skilled welders perform full manual welding and multi‑layer overlay welding. Upon welding completion, frames undergo stress‑relief treatment to release internal stress generated by welding and reduce distortion in later operation. Welds are polished and cleaned, followed by sampling flaw detection to spot concealed defects including air holes, slag inclusion and cold solder joints, ensuring every welding point is firm and reliable.

Once the structure is formed, anti‑corrosion painting is carried out. Steel surfaces are derusted first to remove scale and grease. Primer, intermediate coat and topcoat are applied in sequence, with supplementary painting focused on weld edges and corners. This complete multi‑coating system resists erosion by rainwater, dust and salt spray and slows steel‑structure corrosion. Meanwhile, self‑developed and self‑manufactured hoists, stainless‑steel safety locks and electric control systems are assembled. Overload‑tilt dual‑alarm and power‑off locking functions are commissioned to build four‑fold redundant safety protection.

Finished assembly does not lead directly to packaging and shipment. Every suspended platform goes to the comprehensive test station for full‑load trial operation, rope‑break simulation and extreme overload tests. Safety devices, braking performance and electrical systems are verified one by one. After passing all inspections, an independent equipment file is created together with complete documents including factory reports, calibration certificates and maintenance manuals.

After equipment arrives at the project site, technical staff provide on‑site installation guidance and deliver on‑site safety disclosure, teaching operators to identify hazards and perform routine inspections. From preliminary survey, scheme design, structural processing, welding flaw detection and anti‑corrosion painting, to complete‑machine testing and delivery briefing, the birth of a suspended platform follows a full set of rigorous workflows.